dl380 g9 hp - An Overview
dl380 g9 hp - An Overview
Blog Article
سلام وقتتون بخیر، ارسال به شهرستان هم دارید؟چه مدت زمان میبره تا ارسال شه؟
GPU enablement package WARNING: To reduce the potential risk of private damage, electrical shock, or harm to the equipment, get rid of the facility wire to eliminate electrical power with the server. Urgent the facility On/Standby button would not shut off method power entirely. Parts of the ability provide and several inside circuitry keep on being active right until AC power is taken off. Page eighty three Install the GPU retention clips on to the air baffle. Get rid of the standard heatsinks. Set up the significant-performance heatsinks. Components options set up 83... Web page eighty four Put in the air baffle.
با عضویت در خبرنامه از آخرین پیشنهادها و تخفیف های ما زودتر از بقیه با خبر شوید! ثبت نام
Mirrored memory configuration Mirroring offers protection versus uncorrected memory problems that might in any other case lead to server downtime.
assumes you might be skilled from the servicing of Computer system machines and properly trained in recognizing dangers in products and solutions with harmful Strength
It's many functions to pack into these types of a little piece of apparatus, but HP's Proliant line of servers is commonly the most effective selling line of apparatus each year, so these options aren't any shock. Number of businesses guidance their hardware as well as HP.
You may be thinking wherever another two SFF drives go. HP has redesigned the PSUs by creating them twenty for each cent smaller and equipped them side by aspect in the again Therefore the House higher than can be utilized for two extra warm-swap drives.
Install the access panel Area the entry panel in addition to the server with the hood latch open. Enable the panel to increase earlier the rear from the server approximately one.
Functions Powering up the server To energy original site up the server, push the ability On/Standby button. Energy down the server Prior to powering down the server for any up grade or upkeep methods, perform a backup of important server info and packages.
Install the expansion board. Link any expected internal or external cables towards the expansion board. See the documentation that ships Together with the enlargement board. Put in the PCI riser cage (on page 31).
منابع تغذیه اسلات انعطاف پذیر کارآمد به عنوان تیتانیوم طبقه بندی میشوند و از خدمات کشف نیرو پشتیبانی میکنند. این کارایی انرژی بالا را تضمین میکند و ماژول پشتیبان باتری، پایداری بالایی را تضمین میکند.
Electrical power up the server ("Powering up the server" on website page 26). 3-slot PCI riser cage choice WARNING: To reduce the potential risk of particular injuries, electric shock, or damage to the equipment, remove the facility twine to remove power from the server. Urgent the Power On/Standby button does not shut off procedure electric power entirely.
The DL360 can be a 1U server, while the DL380 is actually a 2U server. Other than that, They may be equivalent in layout and have many of the same significant-excellent parts.
نشانی ایمیل شما منتشر نخواهد شد. بخشهای موردنیاز علامتگذاری شدهاند *
Certified memory is effectiveness-tuned for ProLiant and BladeSystem servers and provides potential Improved assist as a result of Energetic Wellness and manageability computer software. Persistent memory brings together the general performance of memory Using the persistence of classic storage.